„FIRST STAGE:
The scope of works included:
– repair of the cracks in the cemetery walls, execution of drip edges on the covers of the cemetery walls,
– repair of crosses and tombstones damaged after the winter period,
– partial replacement of the graves borders,
– arrangement of the cemetery area after the winter period,
– replacement of stone markings of the graves,
– covering the roof of the chapel,
– renovation of the chapel plasters,
– repair of the brick posts at the main entrance,
– repair of the central element with the mast,
– execution of an information board at the entrance from the chapel side,
– repair with partial replacement of the covers on the wall at the main entrance,
– inspection and repair of the water system in the cemetery,
– repair of drainage along the cemetery walls,
– execution of drainage of the terrace retaining walls.